Achievements you can see every day across Libya

Since 2004, Barga’s work has never stopped. From our first housing units in Benghazi to the largest fully serviced residential compounds in eastern Libya, we have built hands-on experience in every field of contracting. Every project on this page is a real figure — and a place where buildings, networks and roads now stand, used by thousands of Libyans.

Achievements you can see every day across Libya
Achievements you can see every day across Libya

61

projects completed in full

Our largest investment project

Daryana Residential Compound — 15,000 fully serviced units

On land wholly owned by Barga Libya Holding, covering more than 200 hectares in Daryana, Benghazi, we are delivering the largest integrated residential investment project in eastern Libya. The project goes far beyond housing units: it creates an entirely new urban community, with integrated facilities and services that give its residents a sustainable living environment away from the congestion of the city centre.

We have already begun Phase One, comprising 2,472 housing units, together with public-service buildings, a wastewater treatment plant, a drinking water purification plant and complete infrastructure networks.

Total housing units 15,000 units
Total area more than 200 hectares
Zone One (under construction) 2,472 units / 72.27 ha
Zone Two 5,712 units / 70.68 ha
Zone Three 6,832 units / 73.82 ha
Daryana Residential Compound, Benghazi — aerial view
Daryana Residential Compound — aerial view

Daryana Residential Compound

Key project components

7 main components

Multi-storey residential buildings in a range of models and sizes.

6 infrastructure networks: drinking water, sewerage, stormwater drainage, roads, and lighting and power.

A desalination plant and wastewater treatment stations serving the entire population of the compound.

Two electrical substations rated 220/66 kV and 66/11 kV.

Public-service and administrative buildings, green spaces, sports grounds and pedestrian walkways.

Lighting for the residential units and outdoor areas powered by modern renewable energy.

A main dual carriageway linking the compound to the coastal road.

Delivery continues

Ten major projects under way now

Alongside the handover of completed projects, our engineering teams are working on ten major projects with a combined value of more than 3.5 billion Libyan dinars, stretching from Benghazi to Al Qubbah and Derna and spanning housing, infrastructure, public facilities and tourism.

Daryana Residential Compound

Residential

Benghazi

Daryana Residential Compound

2,472 fully serviced housing units — Phase One of the largest residential investment project in eastern Libya.

Al Qubbah Residential Compound

Residential

Al Qubbah

Al Qubbah Residential Compound

2,000 fully serviced housing units, one of the largest housing projects currently under construction in the country.

West Derna Residential Compound

Residential

Derna

West Derna Residential Compound

616 fully serviced housing units at the western entrance to Derna, part of our continuing contribution to the reconstruction of the city.

Al Izdihar Project

Residential

Derna

Al Izdihar Project

656 housing units with full facilities and services overlooking the Mediterranean, on the former Al Jabal Company site.

40 Affordable Housing Units

Residential

Derna

40 Affordable Housing Units

A turnkey residential project in the city of Derna.

Social Security Public Library

Administrative

Benghazi

Social Security Public Library

An architectural design inspired by authentic Libyan style, adding a distinctive new landmark to the city of Benghazi.

Social Security Fund Headquarters — Eastern Branch

Administrative

Benghazi

Social Security Fund Headquarters — Eastern Branch

An administrative building of iconic design that reflects our clients’ trust in us with their institutional facilities.

Integrated Infrastructure — Al-Kuwayfiyah

Infrastructure

Benghazi

Integrated Infrastructure — Al-Kuwayfiyah

One of the largest infrastructure projects currently under way in Libya, covering an area of approximately 400 hectares.

Integrated Infrastructure — West Derna Entrance

Infrastructure

Derna

Integrated Infrastructure — West Derna Entrance

Complete infrastructure networks for a 2,000-unit housing project at the western entrance to Derna.

Ouzou Tourist Hotel — Maintenance, Upgrade and Refurbishment

Tourism

Benghazi

Ouzou Tourist Hotel — Maintenance, Upgrade and Refurbishment

A step change in the standard of hotel service, part of our vision to support the tourism sector in Libya.

From our sites

The work goes on — photos from the field

Recent shots from our ongoing projects — click any image to view it full size.

Archive of achievement 2004 – 2024

61 projects completed in full, with an impact that endures

Over twenty years, we have handed over projects across many disciplines with a 100% completion rate — from housing to roads, power and infrastructure, as well as maintenance and refurbishment projects that have added real value to public facilities in Libyan cities.

  • 100 housing units in Benghazi
  • 80 housing units in Al Abyar
  • 55 housing units in Tocra and its surroundings
  • 150 housing units in Susa and its surroundings
  • 75 housing units in Jalu
  • 600 fully serviced housing units in Jardina
  • Two integrated cultural centres (Ganfouda and Al Wuhayshi), Benghazi
  • A model school in Sirte
  • A 15-classroom school in Qaminis
  • Construction of the Berenice 1 and 2 hotels, Benghazi
  • Construction of the Graduate Studies building, University of Benghazi
  • Maintenance of the administrative and service buildings at Al Guwarsha School, Benghazi
  • Maintenance of two Wahda Bank branches — Al Souq and Al Sabri, Benghazi
  • Maintenance of the Water and Sewerage Company building, Benghazi Plain
  • Foundations for telecommunication towers for Al Madar, Ajdabiya – Jalu
  • Maintenance and cleaning of sewerage networks and pumping-station wet wells in Al Sabri and central Benghazi
  • Maintenance of the sewerage network in Al Hadaiq, Benghazi
  • Maintenance and recommissioning of the Al Hawari well fields, Benghazi
  • Maintenance of a main drinking water line in Al Masakin, Benghazi
  • Maintenance of a main sewer line on the Third Ring Road, Benghazi
  • A 400 mm drinking water line on the Fifth Ring Road, Benghazi
  • Completion of drinking water sections and renewal of a 100 mm line on Istiqlal Street, Benghazi
  • 100 mm water lines in Al Wuhayshi, Benghazi
  • A stormwater drainage network on the Fourth Ring Road, Benghazi
  • A stormwater drainage network on Palestine and Lebanon streets, Benghazi
  • Kuwait Road dual carriageway from the Fourth to the Fifth Ring Road, Benghazi
  • Repair of 24 sections of potholes, bumps and subsidence on main and secondary roads, Benghazi
  • Temporary paving of Ras Al Minqar Road, 1,100 metres, Benghazi
  • Temporary paving of the link road between Al Rabish junction and Ras Al Minqar Road, Bu Dzira
  • Temporary paving of the link road between Palestine Street and Syria Street, Shabna
  • Temporary paving of the link road from the Fifth Ring Road to Shabna, Benghazi
  • Temporary paving of various sections in Al-Kuwayfiyah, 4,550 metres, Benghazi
  • Upgrading of existing substations and rerouting of cables (Al Hawari, Sidi Ubaid, Sidi Hussein), Benghazi
  • Maintenance of the General Electricity Company control centre on Msaed Road (4 storeys), Tobruk
  • A substation with external transformer foundations, cable trenches and a fuel tank, Ajdabiya
  • Demolition and removal of building debris in Zone 1 of Al Jamahiriya Hospital, Benghazi
  • Demolition and removal of the Customs and Passports buildings, Benghazi
  • Demolition and removal of destroyed and unsafe buildings in Al Sabri and central Benghazi
  • Demolition and removal of destroyed and unsafe buildings in the city of Derna

Achievement on this scale needs real capabilities

Every project on this page was delivered by our own in-house engineering teams with plant and production units owned by the company — which is what allows us to commit to quality and to deadlines at the same time.

The next phase

Projects we are planning with the same ambition

Our development plans do not stop at what we are delivering today. As part of our growth strategy, we are studying and planning the next phases of the Daryana Residential Compound — Zones Two and Three, with more than 12,500 additional housing units — alongside new infrastructure and public-facility projects elsewhere in eastern Libya, to consolidate our position as the region’s largest integrated urban developer.

Architectural render — Master plan of a residential compound
Master plan of a residential compound
Architectural render — A residential compound with its facilities and services
A residential compound with its facilities and services
Architectural render — Night lighting and sports facilities
Night lighting and sports facilities